Phase I structural engineering to increase the live load capacity of floors 3 through 8 from 60 PSF (office) to 125 PSF (self-storage) for building permit submission.
Adaptive reuse of two existing six- to seven-story office buildings on the Georgetown waterfront (1000 & 1050 Thomas Jefferson), with potential for one- to two-story additions.
The project replaces an existing seven-story office building with a new eight-story apartment building consisting of five stories of wood construction over a three-story podium, built on top of the existing below-grade parking garage.
Structural engineering for the Museum of the Bible at 3rd and D Street SW, a major conversion and renovation transforming an existing structure into a world-class museum facility.