
Georgetown Park Mall
Georgetown Park Mall ~ Washington, D.C. TCE performed garage repair where traffic bearing membrane was applied elevated drive aisles. Additional garages repairs being performed nearly

Georgetown Park Mall ~ Washington, D.C. TCE performed garage repair where traffic bearing membrane was applied elevated drive aisles. Additional garages repairs being performed nearly

The Boro ~ Tysons Corner, Virginia This building consists of A1 High-rise rental residential, concrete construction, 438,000 gsf, A2 High-rise condominium, concrete construction 218,000 gsf,

The Phoenician Resort ~ Scottsdale, Arizona The Phoenician Resort is a luxury resort located in Scottsdale Arizona. The property is situated on 250 acres at

Cameron House ~ Silver Spring, Maryland Cameron House replaces a 1960’s garden-style apartment building torn down in 2008. In its place, this 380,000 gsf 15-story

Solaire Metro Apartments ~ Silver Spring, Maryland NEW DESIGN: TCE provided structural design services for this 17-story mixed-use complex located next to a MARC railway

DC Jewish Community Center ~ Washington, DC The Jewish Community Center’s original headquarters facility was built in 1930. After occupying the building for over 30

Apex 7272 Wisconsin Ave ~ Bethesda, Maryland Located at the gateway to the Bethesda Central Business District, the APEX redevelopment at 7272 Wisconsin Avenue transforms

Capitol Crossing ~ Washington, DC This 2.2 million gsf multi-phase mixed-use development was designed over US I-395 on a seven-acre site covering three city blocks.

Gallery at Capitol Riverfront ~ Washington, DC This mixed-use 310,304 gsf, 324-unit residential building with 13-stories plus penthouse is situated directly over the Navy Yard

Chevy Chase Pavilion ~ Washington, DC This 1,000,000 gsf mixed-use development incorporates an Embassy Suites Hotel, offices, high-end retail, parking, and atrium adjacent to existing