Phase I structural engineering to increase the live load capacity of floors 3 through 8 from 60 PSF (office) to 125 PSF (self-storage) for building permit submission.
Phase II of Hamilton Green features a 16-story office building tower totaling 307,000 gsf and a four-story below-grade parking garage with 600 spaces (240,000 gsf).
Adaptive reuse of two existing six- to seven-story office buildings on the Georgetown waterfront (1000 & 1050 Thomas Jefferson), with potential for one- to two-story additions.
Major architectural renovations to the existing building at 101 Constitution Avenue, with structural focus on the Roof/Penthouse Level and Ground Floor/Concourse Level.