Projects

All Projects

tceadmin

Georgetown Park Mall

Georgetown Park Mall ~ Washington, D.C. TCE performed garage repair where traffic bearing membrane was applied elevated drive aisles. Additional garages repairs being performed nearly

tceadmin

The Boro

The Boro ~ Tysons Corner, Virginia This building consists of A1 High-rise rental residential, concrete construction, 438,000 gsf, A2 High-rise condominium, concrete construction 218,000 gsf,

tceadmin

The Phoenician Resort

The Phoenician Resort ~ Scottsdale, Arizona The Phoenician Resort is a luxury resort located in Scottsdale Arizona. The property is situated on 250 acres at

tceadmin

Exelon @ Harbor Point

Exelon at Harbor Point ~ Baltimore, Maryland The 962,650 gsf site of Exelon Corporation’s new headquarters is comprised of two buildings separated by an expansion

tceadmin

Waterfront Mall

Waterfront Mall ~ Washington, DC This adaptive re-use and expansion project consists of two office buildings with flat slab concrete construction. The east building, located

tceadmin

Sienna Park

Sienna Park ~ Arlington, Virginia This six-story mixed-use property features 205,550 gsf 188 condominium units, 14,600 gsf office space, and 32,600 gsf retail space. The

tceadmin

O Street Market

O Street Market ~ Washington, DC NEW CONSTRUCTON: West of 8th Street – Complex includes a nine-story 136,400 gsf west residential condominium building, nine-story 136,208

The Pentagon from the air.
tceadmin

United States Pentagon

United States Pentagon ~ Washington, DC Constructed in just 16 months during WWII, the Pentagon is the world’s largest office building and home to operations

tceadmin

Cameron House

Cameron House ~ Silver Spring, Maryland Cameron House replaces a 1960’s garden-style apartment building torn down in 2008. In its place, this 380,000 gsf 15-story