Phase 1 of a major residential mixed-use development at 909 Half Street SE comprising 390,000 gsf of residential, 30,000 gsf of retail, and 150,000 gsf of parking for a total of 570,000 gsf.
A major residential mixed-use development at 300 M Street NE comprising approximately 400,000 gsf of residences, 12,000 gsf of retail, and 134,000 gsf of parking for a total of 546,000 gsf.
A 10-story mixed-use building at Capitol Place (455 Eye Street NW) delivering 22,580 gsf of commercial space, 375,907 gsf of residences with a pool on the roof, and 160,000 gsf of two levels of below-grade parking — for a total of 558,487 gsf.
A 17-story residential development at 4900 Fairmont Avenue in Bethesda delivering 260,342 gsf of residences and 82,227 gsf of parking for a total of 342,569 gsf.
A new 13-story residential development at 33 N Street NE delivering 330,000 gsf of residences above grade with retail and amenity at the ground floor, plus 98,400 gsf of three to three-and-a-half levels of below-grade parking, for a total of 428,400 gsf.
A five-level wood-framed residential community of 231,553 gsf supported by a reinforced concrete transfer slab at the second floor, with 15,079 gsf of retail and 4,390 gsf of lobby at grade and 115,500 gsf of parking (308 spaces).
Structural engineering participation in the Capitol Crossing development — a transformative mixed-use project spanning Second and Third Streets NW over the Center Leg Freeway.