Crystal Mall I ~ Arlington, VA
Project Details
| Field | Details |
|---|---|
| Size | GSF unavailable |
| Stories / Height | Elevator, slab-infill, and seismic work in the existing building |
| Market | Office / Federal |
Project Overview
Crystal Mall I was opened up and brought up to federal standards without taking the existing building apart. A new shuttle elevator runs from the lobby down to level B3, with a new pit, slab openings, and underpinning where the existing footings required it. A new concourse slab, checks at the proposed cores, and a seismic analysis written to GSA criteria completed the work.Structural Highlights
- Shuttle elevator from B3 to the lobby
- GSA seismic analysis and slab-infill design