Washington National Cathedral – Hearst Hall Cafeteria ~ Washington, DC
Project Details
| Field | Details |
|---|---|
| Size | 15,500 gsf |
| Stories / Construction | Alterations inside existing Hearst Hall |
| Market | Education / Institutional |
Project Overview
Inside Hearst Hall at Washington National Cathedral, a 15,500 gsf cafeteria had to be cut into a building that was never drawn for it. Floors were opened, new supports framed, a stair and an elevator added, an egress stair introduced, and portions of the existing walls underpinned so the hall could take a new public room without losing the structure around it.Structural Highlights
- 15,500 gsf alteration inside Hearst Hall
- New stair, elevator, egress stair, and underpinning