NIMA Garage

 

Project Overview


TCE performed a comparative structural analysis for the proposed NIMA Garage evaluating two framing systems: cast-in-place post-tensioned concrete and precast prestressed concrete. The study assessed the advantages of each approach, including constructability, construction schedule, cost considerations, and long-term durability, providing the owner with the technical information needed to determine the most appropriate structural solution for the project.


Engineering Scope

 
  • Comparative evaluation of cast-in-place post-tensioned and precast prestressed concrete structural systems.
  • Assessment of structural constructability, construction sequencing, and schedule considerations.
  • Evaluation of system performance, cost considerations, and long-term durability.
  • Structural engineering analysis to support informed owner decision-making.


Market Sector

 

Parking Structures